Case Study: Brighton Museums
BRIEF: Create a design that links all five sites
CLIENT: Royal Pavilion Trust
DATE: 2019 + 2021
TIMESCALE: 6 months
DETAIL: The Brighton Museums consisted of 5 visitor sites. The
aim was to capture all 5 sites into one design to sell
in all the gift shops.
It was due to be completed in 2020, but has been
postponed to late 2021 due to the pandemic